Monday, November 16, 2009

Details......


Finishing up the last of the wiring and now everything works. Routing fuel lines, still need to get some small clamps. Tonight I'll reverse - bleed the front brake, grease the swingarm pivot, fill the gearbox and forks with oil, ........ And then off the stand she comes and she will begin resting on two wheels.

Mount the pipes, pour in some 50:1 pre-mix, and then the start her up.

The RD is going to need quite a bit of "shake-down riding". Coming from a pile of parts, the bike had no baseline setup. During the "shake-down" period I am going to ride the bike unpainted, al natural. I can hardly wait!

No comments:

Post a Comment